Reference Info from Prescriptive Compliance Tool
Live
Zone
--
Last Update
--:--:--
Climate Zone Selection
IMPORTANT! Select your project location based on NECB 2025 Climate Zones or Provincial Regulations.
Selected Zone U-values:
Assembly Type Max U-value
Walls (V-#) 0.210
Roofs (H-#) 0.162
Floors (H-#) 0.162
Quick Actions
Compliance
--
Vertical --
0.00
0.00
--
Horizontal --
0.00
0.00
--
Status: --
Vertical Above-Ground Assemblies Auto-sync enabled
Proposed Building Assemblies (Vertical)
# Assembly Name * Area Aip (m²) * U-value Uip (W/m²·K) * U × A (W/K)
Total Σ(Uip × Aip): 0.00 W/K
Reference Building Assemblies (Vertical) - Auto-synced from Proposed
# Assembly Name (Synced) Area Air (m²) (Synced) U-value Uir (W/m²·K) * U × A (W/K)
Total Σ(Uir × Air): 0.00 W/K
Horizontal Above-Ground Assemblies Auto-sync enabled
Proposed Building Assemblies (Horizontal)
# Assembly Name * Area Aip (m²) * U-value Uip (W/m²·K) * U × A (W/K)
Total Σ(Uip × Aip): 0.00 W/K
Reference Building Assemblies (Horizontal) - Auto-synced from Proposed
# Assembly Name (Synced) Area Air (m²) (Synced) U-value Uir (W/m²·K) * U × A (W/K)
Total Σ(Uir × Air): 0.00 W/K
Mandatory Compliance Questions
Note: All five questions must be answered "Yes" (checked) for the trade-off path to be compliant. Questions 1, 4, and 5 are automatically validated based on your input data.
Trade-off Compliance Summary
Calculation Results
Category Proposed Σ(U×A) Reference Σ(U×A) Difference
Vertical Assemblies 0.00 0.00 0.00
Horizontal Assemblies 0.00 0.00 0.00
Total 0.00 0.00 0.00
Compliance Checklist
Export Options